High summer in the Highlands
25/10/08 19:55
Predictably, the formal joining of the track never took place, with various excuses floated about the need to perform various complex alignments, re-curvatures and ballasting manoeuvres before the final cut could be made. Nonetheless a golden spike was produced, and duly spiked ‘twixt rail and sleeper. Probably only gold-painted steel, but the thought was there.
Some photos are here.